Frog and Toad (Knitted), March 25, 2020: On page 4, Round 3, the stitch count indicated at the end of that round should be 4 not 2.
Frog and Toad (Knitted), February 2, 2021: On page 13, under First Leg, you will knit 3 more rounds, not 4. The total number of rounds (8) remains the same.
On page 14, under Divide for Back and Front, it should be: Next Row (RS): K13, place previous 26 stitches on waste yarn for Back, knit to end. [26 stitches for Front]
Dahlia Blanket, April 18, 2021: For the written instructions on page 6, the stitch count provided at the end of Round 137 (608 stitches; 38 stitches between markers) should be at the end of Round 139, not Round 137.
Frog and Toad (Knitted), August 2021:
Yarn A: 1 skein of Kelson DK from Kelson Goods (www.kelsongoods.com, 75% superwash merino and 25% nylon) in River Grass. Each skein is approximately 122 yards (112 meters). Frog requires approximately 65 yards (60 meters).
Yarn B: 1 skein of Kelson DK from Kelson Goods (www.kelsongoods.com, 75% superwash merino and 25% nylon) in Tumbleweed. Each skein is approximately 122 yards (112 meters). Toad requires approximately 50 yards (45 meters).
Frog and Toad (Both Knitted and Crocheted), February 2022:
An alternative (nearly indistinguishable) color for the yarn needed to make the pants was added to the pattern and is called Mogit.
Fireworks Pullover, April 2022:
Edits were made to Rounds 4 and 22 of the Sleeves:
Round 4: K1, p7 (7, 9, 9, 9), yo 1 (1, 1, 1, 0) time(s), k1, p3, k1 (1, 1, 1, 0), MB 0 (0, 0, 0, 1) time(s), p1 (1, 1, 1, 2), p2tog 1 (1, 1, 1, 0) time(s), k1 (1, 1, 1, 0), MB 0 (0, 0, 0, 1) time(s), p2tog 1 (1, 1, 1, 0) time(s), p1 (1, 1, 1, 2), k1 (1, 1, 1, 0), MB 0 (0, 0, 0, 1) time(s), p3, k1, yo 1 (1, 1, 1, 0) time(s), p7 (7, 9, 9, 9).
Round 22: K1 (1, 1, 2, 2), p1 (1, 2, 2, 2), k3, p2tog, p1, k1, yo, p5, MB, p3, k1, p3, MB, p5, yo, k1, p1, p2tog, k3, p1 (1, 2, 2, 2), k0 (0, 0, 1, 1).
Striped Wedge Pullover, April 2022:
On pages 6 and 7, not all sizes were included in this line of instruction, it should be:
Next Row (wrong side): With Color A, k51 (53, 55, 57, 59), bind off 71 (73, 75, 77, 79) stitches. [51 (53, 55, 57, 59) stitches]
Little Red Riding Hood 3-in-1-Doll
On page 18, under Little Red Riding Hood Top, it should be Rows 9-19, not 9-23.
Mosaic Blanket, July 2023:
Row 11 of the written instructions is missing a “slip 1.” It should be:
Row 11: With Color A: K2, *[slip 1, k1] 4 times, slip 1, k5, [slip 1, k1] 4 times, slip 1, k9, [slip 1, k1] 4 times, slip 1, k5, [slip 1, k1] 4 times, repeat from * 2 (3) more times, slip 1, k2.
The chart is correct.
Frog & Toad (Crochet), September 2023:
On page 12, Row 2 (WS), there is an extra “2” that should not be there. The row ends with “2 sc in last sc,” not “2 sc in last 2 sc.”